What installation includes
A complete scope can include modules, mounting structures, inverter, DC and AC protection, cabling, earthing, lightning protection, monitoring and applicable metering coordination. Final equipment and scope depend on the approved design.
Before work begins
The team reviews usable roof area, structure, shade, electrical connection, equipment location, cable paths, access and safety needs. The proposal should identify assumptions and exclusions clearly.
During installation
Mounting alignment, weatherproofing, cable management, earthing and protective devices are handled systematically. Work sequencing is planned around the property and operating environment.
Testing and handover
Commissioning should include electrical checks, inverter setup, monitoring access and a practical explanation of shutdown, alerts and maintenance. Grid procedures vary and must follow current utility requirements.